May I ask the coal-fired boiler before the installation of the need for environmental protection dep

author:admin release date:2020-01-06 view: QR code sharing

May I ask the coal-fired boiler before the installation of the need for environmental protection department approval, approval of the document basis?


Must be approved before it can be put into use, according to the Environmental Impact Assessment Law of the People's Republic of China

Environmental Impact Assessment Law of the People's Republic of China: New coal-fired heating boilers are prohibited in areas covered by urban central heating pipe networks

Environmental Impact Assessment Law of the People's Republic of China: Boiler Room Project Must Be Conducted first


The EIA includes:

Analysis of environmental rationality of site selection;

Analysis of the production process;

Analysis of major pollutants and emissions to meet standards;

Environmental protection measures;

Total control indicators;

Site selection requirements can not affect environmentally sensitive areas, total control indicators meet the requirements, environmental protection measures effectiveness analysis.


Inner Mongolia boiler transformation


Environmental transformation of boilers in Inner Mongolia


In accordance with the above contents of the EIA approval documents (EIA report, table, registration form), the boiler room can start construction, before the start of operation also need to carry out environmental protection acceptance.

Before the environmental protection procedures are completed, other departments shall not approve the relevant documents, environmental procedures have the right to a veto, but also other relevant approval documents pre-procedures.


Express Lane

National Hotline

0086-400-1618-9680086-400-1618-968

Mailbox:nmggyl168@163.com

QQ:975326977

Copyright © 2019Inner Mongolia highland blue energy conservation and Environmental Protection Technology Co., Ltd

蒙ICP备18000015号-1

Contact:Zhao General Phone:86-13451317888 / 0471-8526678

Address:Tokto County Yanshan Camp Township Township Government South 100 meters east

National Service Hotline:0086-400-1618-968Mailbox:nmggyl168@163.com

Technical support:Yuan Jing E-commerce

微信二维码
在线客服
二维码 扫一扫更精彩
National Hotline:

0086-400-1618-968

关闭

在线留言

Online Message